We built and rehabilitated HSY's water supply and sewer network and improved streets in Mankkaa, Espoo, on sections of Mankkaantie, Vanha Mankkaantie, Koivuviidantie and Kalevalantie.
A total of around 4,100 metres of water supply and sewer lines were built, mainly by excavation and partly by trenchless methods. Around 3,000 metres of DN 600 and around 1,000 metres of DN 400 trunk water mains were built, around 1,310 metres of 2 × DN 600 pressure sewers and a total of around 2,100 metres of DN 200–800 wastewater sewers. The contract also included a control valve station, three district metering chambers, as well as equipment chambers, flushing posts and fire water stations.
The lighting, operator conduits and all surface structures of the streets were renewed: paving, asphalt, green areas and traffic control devices and signs.
Large pipes in the middle of heavy traffic
The contract was carried out on very busy streets. The DN 600 trunk lines and twin pressure sewers required wide excavations in the same street area where traffic flowed the whole time.
Soft ground and hard rock in the same contract
Part of the line ran through soil requiring ground improvement, part through rock. The same contract required both pile slabs and column stabilisation and rock excavation in the street area.
Renewing old lines while in use
Some of the water mains and sewers were renewed by sliplining and relining the old pipes. The work had to be coordinated with the network in operation.
The excavations were supported with sheet pile walls, and the contract included around 4,000 m² of sheet piling.
Ground improvement was carried out with pile slabs and column stabilisation. The rock in the street area was excavated both by blasting and by wedging.
Using trenchless methods, around 240 metres of distribution water main were renewed by sliplining the old pipes, and around 300 metres of wastewater and stormwater sewers by relining.
Finally, the streets were completed with new lighting, paving, asphalt and green areas.