We rehabilitated Helsinki's main street, Mannerheimintie, between Postikatu and Reijolankatu. All structural layers, surfaces and technical systems were renewed.
The tram tracks were renewed along the entire Mannerheimintie section of the contract. The contract also included the side streets in the northern section.
The project was carried out as a construction management contract with a target price of around €46 million.
The busiest street in the city
Mannerheimintie carries trams, buses, cars, cyclists and pedestrians. The work was carried out in the middle of all this traffic.
Numerous stakeholders
Numerous stakeholders operate along the street, and their activities had to be taken into account at every stage of the work.
Municipal engineering from the 1800s
Some of the municipal engineering being rehabilitated dated back to the 1800s.
The work was divided into two phases. First, the section south of Runeberginkatu was built, after which the work moved to the northern section as far as Reijolankatu, including the side streets.
As a construction management contract, the work was planned and managed together with the client within the target price.