Maria campus – Lastenkodinkatu bridge

Maria campus – Lastenkodinkatu bridge
Location
Kamppi, Helsinki
Client
City of Helsinki, Urban Environment Division
Schedule
11/2024–12/2025
Contract type
General contract
Contract value
€3.8M
Services
Urban construction

We built the Lastenkodinkatu bridge as part of the renewal of the public areas of the Maria growth company campus. In addition to the bridge and the square, the scope included a ramp to Baana and the associated retaining walls.

The demanding nature of the project was highlighted by the post-tensioned concrete bridge and the natural stone wall. In the bridge, precision in building the load-bearing structure was combined with managing the concreting and post-tensioning works; in the stone wall, the challenge was fitting the stones and finishing the visible surface.

The structures were fitted into the existing urban environment, and access along Baana as well as emergency traffic had to be taken into account throughout construction.

01

Precision in building a post-tensioned bridge

A post-tensioned bridge requires precise coordination of formwork, reinforcement and post-tensioning components. Concreting, strength development and post-tensioning form an interlinked chain of work in which the order of work phases and quality assurance are decisive.

02

Fitting and appearance of the natural stone wall

Each stone has a unique shape, and they had to be fitted to the designed wall line and levels. The joints, connections and rhythm of the surface had to form a uniform whole in which the precision of the work remains visible.

03

Building next to Baana

Baana had to remain in use throughout construction, and an opening suitable for emergency vehicles had to be left under the bridge site. Bridge construction, temporary supports and traffic arrangements had to be coordinated.

The construction of the post-tensioned bridge and the finishing of the natural stone wall were at the heart of the project. In the bridge, the challenge lay in coordinating the work phases of the load-bearing concrete structure; in the stone wall, in fitting individual stones into a uniform wall surface.

In both, precision was decisive: in the bridge for the performance of the structure, and in the stone wall also for the appearance of the finished environment.

Kuvat

Työmaalta

Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge
Maria campus – Lastenkodinkatu bridge

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project