Renewal of the Kivikko Sortti station

Location
Helsinki
Client
HSY
Schedule
1 - 12/2023
Contract type
General contract
Contract value
approx. €4.4M
Services
New construction, Urban construction

We renewed the Kivikko Sortti station: we built four new buildings and a steel-framed drive-through canopy, and renovated and extended the existing building G.

The new buildings have timber element frames, and the hall has a steel frame. The facades were clad with recycled Rheinzink sheet metal. The HVAC, plumbing and electrical works were subcontracted. The contract also included improving the yard area, including its surfacing.

The recycling station was in use for almost the entire contract. The station was closed for only three months, while the yard surfacing and the renovation of building G were carried out.

01

Customers and the site in the same yard

Every day, hundreds of cars with trailers and refuse trucks visit the Sortti station. Site traffic and customer traffic shared the same yard area for nine months.

02

A three-month closure

The yard surfacing and the renovation of building G required the station to be closed. The time window was three months, and it had to fit all the work that could not be done with traffic in the yard.

03

Recycled material on the facade

The facades were clad with recycled Rheinzink sheet metal. The material came in batches and more could not be ordered in the middle of the work, so consumption had to be calculated precisely and waste minimised.

We started with the new buildings at the edge of the yard so that customer traffic could pass through the middle. The site area was fenced off and given its own access road that did not cross customer traffic.

The closure period was fully planned six months in advance. Surfacing materials, equipment and the demolition work for the renovation were scheduled so that every week of the closure was booked. The station reopened on the agreed date.

The facade sheets were measured and cut according to cutting lists before installation. Leftover pieces were used for details of the canopy and the smaller buildings.

The timber elements were ordered to size and lifted into place on the day of delivery — there was no room for intermediate storage on site.

Photos

From the site

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project