Länsisatamankatu pedestrian overpass

Location
Helsinki
Client
City of Helsinki
Schedule
2022-2023
Contract type
General contract
Contract value
approx. €6M
Services
Urban construction

We built a new steel pedestrian overpass on Länsisatamankatu, as well as cast-in-place retaining walls clad with precast concrete elements. The contract also included installing granite paving on Länsisatamankatu.

The bridge was prefabricated elsewhere and transported to the site by sea. The transport route was simulated, and a shutdown of public transport was planned for the move.

01

The bridge arrived by sea

The prefabricated steel bridge was transported to the site by sea and moved from the harbour into place by land. Every bend, gradient and overhead line along the route had to be measured in advance — a move like this cannot be stopped halfway.

02

One lift, one chance

The bridge was installed during a traffic shutdown, with a single time window reserved for the lift. If the lift had failed, the next opportunity would have been weeks away.

03

Retaining walls before the bridge

The cast-in-place retaining walls had to be completed and clad before the bridge was installed. The strength development of the concrete tied up the early part of the schedule, and there was no room for compromise.

The transport route was simulated before the move. The dimensions, turning radii and clearances along the route were checked on site, and the public transport shutdown was agreed with the transport operator months in advance.

The retaining wall pours were scheduled so that the concrete had time to reach the required strength before the lifting day. The element cladding was installed once the pours had cured.

The lifting day was rehearsed step by step in advance: equipment, lifting accessories, work team and contingency plan. The lift was carried out during the shutdown, and traffic resumed within the same shutdown.

The granite paving was installed after the bridge was completed, once the heavy equipment had left the street area.

Kuvat

Työmaalta

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project