Kuusijärvi service buildings

Award-winning project Arkkitehtuurin Finlandia -palkinto 2026
Kuusijärvi smoke sauna with its green roof
Location
Vantaa
Client
City of Vantaa
Schedule
8/2024 - 6/2025
Contract type
General contract
Contract value
approx. €2.6M
Services
New construction

The Kuusijärvi smoke saunas won the 2026 Finlandia Prize for Architecture. We were the main contractor for the City of Vantaa's project. The buildings were designed by Mer Arkkitehdit and Arkkitehtuuri- ja muotoilutoimisto Talli, and for us as builders, the most important thing was to bring their vision to life as carefully as possible.

We built four new service buildings in the Kuusijärvi outdoor recreation area: two smoke saunas of laminated log construction, a changing room building of block construction and an information and toilet building.

The facades of the smoke saunas were clad with Finnish shou sugi ban boards, in which the surface of the wood is charred to make it weather-resistant. The contract also included building pipelines between the buildings and extending the ground source heating system with new boreholes.

Kuusijärvi is Vantaa's most popular outdoor recreation area, and it remained open throughout the contract. So we were building in the middle of an active recreation area used every day by hikers and sauna-goers.

01

The area stayed open the whole time

The outdoor recreation area was not closed during the contract. The site area, access routes and material deliveries had to be separated from visitors so that both could share the same terrain safely.

02

Special timber needs its own schedule

The charred surface of shou sugi ban cladding cannot be patched afterwards without it showing. The elements had to be protected from transport all the way to installation, and the installation sequence had to be planned before a single board was lifted.

03

Ground source heating and pipelines in the same terrain

The extension of the ground source heating system and the pipelines between the buildings ran through the same narrow area. The excavation sequence determined whether the building services would be ready before the interior works of the buildings.

We divided the site into four sections, one per building, and kept open only the area where work was in progress at any given time. Visitors always had a clear, fenced route to the shore and the car park.

The ground source heat boreholes were drilled and the pipelines between the buildings excavated right at the start, before the foundations took up the space. This meant the building services were ready and waiting when the frames went up.

The log structures and cladding panels were ordered to size and stored under cover on site. The facades were completed one building at a time so that the charred surface was not damaged by other site traffic.

The contract was handed over in June 2025. The area remained in use throughout construction.

Kuvat

Työmaalta

Kuusijärvi smoke sauna with its green roof
Kuusijärvi service building
Aerial view of the Kuusijärvi outdoor recreation area
Kuusijärvi changing room building
Smoke sauna benches
Havu smoke sauna sign
Kuusijärvi smoke sauna in the forest
Kuusijärvi changing room
Changing room lockers
Aerial view of the Kuusijärvi smoke saunas
Corridor of the Kuusijärvi service building

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project