Juhlakallio streets and municipal engineering

Juhlakallio streets and municipal engineering
Location
Juhlakallio, Kirkkonummi
Client
Municipality of Kirkkonummi
Schedule
7/2023–8/2024
Contract type
General contract
Contract value
€11.4M
Services
Urban construction

We converted the roads of the Juhlakallio area in Kirkkonummi into streets and renewed the area's municipal engineering. A total of 20 roads were converted into streets, and water mains, sewers and stormwater sewers were built as part of the street construction.

The contract included sections of Vanha Rantatie, Vanha Heikkiläntie, Tohtorinpolku, Vanha Sairaalatie and Viulunrakentajantie, the junction of Heikkiläntie and Vanha Rantatie, as well as pedestrian and cycle paths and parks. Street construction totalled around 4,000 metres.

01

A deep excavation next to the railway

The water supply and sewer excavation was carried out close to the railway area over a distance of around 800 metres. At its deepest, the open excavation was around five metres deep.

02

An extensive street network in a single contract

The contract covered 20 roads. Street construction was combined with the construction of water supply and sewerage, stormwater systems, lighting and parks.

Rock was excavated in the water supply and sewer trench, and the excavation was supported with trench shoring elements.

In the street areas, we built retaining walls from retaining wall elements, gabion walls, lighting, paving, planting and asphalt surfaces. We also built Tohtorinaukio square with its pergolas and a playground.

The target completion date for the contract was 30 November 2024, but the project was completed as early as August 2024, more than three months ahead of schedule.

Kuvat

Työmaalta

Juhlakallio streets and municipal engineering
Juhlakallio streets and municipal engineering
Juhlakallio streets and municipal engineering
Juhlakallio streets and municipal engineering
Juhlakallio streets and municipal engineering
Juhlakallio streets and municipal engineering

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project