Gräsantori street and bridge contract

Gräsantori street and bridge contract
Location
Olari, Espoo
Client
City of Espoo
Schedule
3/2026–7/2027
Contract type
General contract
Contract value
€5.3M
Services
Foundation engineering, Urban construction

In Olari, Espoo, we are rebuilding a street area of around 400 metres with its municipal engineering, as well as a new square, a dog park and a rug washing area. The grade of the area is being raised by around one metre.

The water supply and sewer lines are being renewed, including wastewater, stormwater and water mains. We are also installing district heating and telecom cable conduits and renewing the area's lighting.

Two old bridges were demolished, and new ones are being built in their place.

01

Weak subsoil

The soil in the area is soft clay. The square, the street and the bridge abutments required several different ground improvement methods.

02

Bridges in a sensitive environment

Both bridges cross the Gräsanoja brook, a sensitive trout stream and part of a movement corridor for flying squirrels. Olarsbynsilta bridge is also located within the ancient monument area of the medieval village of Gräsa, where excavation was carried out under the supervision of an archaeologist.

03

A street in traffic and network relocations

The work is carried out while traffic continues on a collector street in the buffer zone of the West Metro. District heating, water supply and cable relocations were coordinated with several network owners.

The ground was improved with column stabilisation, with panel stabilisation at the bridge abutments, foam glass lightweight fill, steel pipe and reinforced concrete piles and pile slabs. During the contract, foam glass replaced part of the column stabilisation.

Olarinluomansilta bridge is a cast-in-place reinforced concrete slab frame bridge on driven piles, and it replaced an old culvert bridge in a sea flood zone. Olarsbynsilta bridge is a steel truss bridge with a timber deck, built on a drilled pile combi wall and rock anchors. The needs of the brook and the flying squirrels were taken into account in the work methods and schedule.

The work was phased and the traffic arrangements were planned in detail. The machines used renewable fuels, the emission values of natural aggregates were taken into account, and the work was managed using the Infrakit project bank, information models and machine control.

Cast-in-place concrete totals 1,500 m³ in the pile slab of the square, 300 m³ in Olarinluomansilta bridge and 50 m³ in Olarsbynsilta bridge. Stone work covers almost 4,000 m².

Photos

From the site

Gräsantori street and bridge contract
Gräsantori street and bridge contract
Gräsantori street and bridge contract
Gräsantori street and bridge contract
Gräsantori street and bridge contract
Gräsantori street and bridge contract

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project