Kruunuvuori oil tank restoration

Kruunuvuori oil tank restoration
Location
Kruunuvuorenranta, Helsinki
Client
City of Helsinki
Schedule
2025
Contract type
General contract
Contract value
850 000 €
Services
Renovation

We restored the old oil tank on top of the rock in Kruunuvuorenranta and built steel stairs leading up to it from street level.

The restoration of the tank included demolishing and renewing the deteriorated concrete plinth, sandblasting and repainting the shell and restoring the old steel structures.

Mesh fences were installed around the tank to secure the area, as well as tables and chairs for recreational use.

01

No road to the top of the rock

There was no road suitable for vehicles leading to the tank. Heavy transport vehicles could not get there, so in practice all goods traffic was handled with lighter site vehicles, such as wheel loaders.

02

The old paint could not end up in nature

Demolition and sandblasting had to be carried out inside weather protection so that remnants of the old paint and other harmful substances could not get into the surrounding nature.

03

Lifting from uneven rock

The weather protection structures had to be lifted into place from beside the tank, where there was no level base for a crane.

A site road to the tank was built with respect for nature: no rock was removed at all, and the route was inspected in advance with landscaping experts so that the undergrowth was left as untouched as possible and no sensitive natural sites were destroyed.

All work phases were planned around the location of the tank. A special tracked crane, which could be set up on the uneven rock, was brought in to lift the roof trusses of the weather protection.

Scaffolding and weather protection were built around the tank, and the weather protection was kept under negative pressure. This prevented dust from the sandblasting from spreading outside the weather protection.

Photos

From the site

Kruunuvuori oil tank restoration
Kruunuvuori oil tank restoration
Kruunuvuori oil tank restoration
Kruunuvuori oil tank restoration

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project