Sörnäinen metro station renovation

Location
Helsinki
Client
Pääkaupunkiseudun Kaupunkiliikenne Oy
Schedule
2021-2023
Contract type
General contract
Contract value
approx. €6.5M
Services
Renovation

We carried out a major renovation of the ticket hall level of Sörnäinen metro station. At street level, entrances A and B were partly demolished and renewed, the pressure relief shaft was clad, and the waterproofing of the ticket hall roof deck and its associated structures was renewed in the Vaasanpuistikko square. Two lifts were also renewed.

The station had highly demanding building services systems and renovations of them. The layout of the technical rooms was also changed at the technical level.

The station remained in passenger use throughout construction.

01

The station stayed open for two years

Passenger traffic flowed through the station throughout the contract. The site and the passengers shared the same spaces for two years, and the routes had to work every day, including at rush hour.

02

Waterproofing under a square

The waterproofing of the ticket hall roof deck was renewed in the Vaasanpuistikko square — in other words, the station's roof is also a city square. The work progressed from the top down while passengers passed underneath.

03

Building services that can't be switched off

The station's building services systems were renovated while in use. Ventilation, power supply and safety systems had to work without interruption, even though they were being renewed in parts.

Throughout the contract, a clear, fenced route through the station was provided for passengers and moved according to the work phases. Route changes were made at night so that the first passenger in the morning found the arrangements ready.

Entrances A and B were renewed one after the other, not at the same time. One of the station's entrances was always in use.

The deck waterproofing was renewed section by section. Each section was opened, waterproofed and closed under weather protection to prevent water from getting into the spaces below the station.

The building services systems were renovated in subsystems so that the old system remained in service until the new one had been test-run. Shutdowns of the safety systems were scheduled outside traffic hours and agreed separately with the client.

Photos

From the site

Sörnäinen metro station renovation
Sörnäinen metro station renovation

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project