Karstulantie civil defence shelter renovation

Location
Helsinki
Client
City of Helsinki
Schedule
2024-2025
Contract type
General contract
Contract value
approx. €5.1M
Services
Renovation

We carried out the renovation of the Karstulantie civil defence shelter. The work included renewing the building services and shelter systems, repairing the structures and making changes to the spaces.

The contract also included rock excavation and demolition works. The shelter is a rock cavern, where every new penetration and change to the spaces means work in the rock.

The shelter must continue to serve its purpose after the renovation, so airtightness, pressure resistance and the functionality of the systems had to be verified by measurements.

01

A rock cavern with no spare space

Demolition, rock excavation, concrete works and installation of building services were carried out in the same cramped rock spaces. Equipment and materials moved through restricted access routes, and work phases could not be run in parallel just any way.

02

Rock excavation in an already built facility

The changes to the spaces required rock excavation in a space that already contained structures and building services. Vibration and loose rock had to be controlled so that the structures to be preserved would not be damaged.

03

Shelter requirements don't bend

Shelter systems, airtightness and pressure resistance are regulatory requirements. Every penetration and seal had to be made and documented so that compliance could be demonstrated afterwards.

The work was phased space by space: demolition, rock excavation, structures and building services progressed in the same order from one space to the next, so that only one trade at a time worked in the cramped spaces.

Rock excavation was carried out using careful methods, and vibration was measured at the structures to be preserved. The measurement results were reviewed with the client as the work progressed.

Penetrations and seals for the shelter systems were documented during installation, not only at handover. Airtightness tests were carried out section by section, so any deviations were found while they were still easy to fix.

The building services and shelter systems were test-run before handover.

Photos

From the site

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project