Water supply construction for Läntinen Teatterikuja & Kellosilta

Location
Helsinki
Client
HSY, Helsinki Region Environmental Services Authority
Schedule
2023-2024
Contract type
General contract
Contract value
approx. €1.3M
Services
Urban construction

We rehabilitated water supply and sewerage at two separate sites. On Teatterikuja in central Helsinki, water supply and sewer lines were renewed in a very narrow street area lined with historic buildings.

In the Kellosilta area in Pasila, existing water supply and sewer lines were renewed.

Two sites, two districts and one contract — but completely different operating environments.

01

Historic buildings at the edge of the excavation

Teatterikuja is lined with old buildings whose foundations cannot tolerate movement. Excavation next to them required precautions and continuous monitoring.

02

An alley with no room

Teatterikuja is narrow. The excavator, excavated soil, pipe materials and pedestrians could not all fit in the same space at the same time, so the work sequence was everything.

03

Two sites, one work team

Teatterikuja and Kellosilta are on different sides of the city. The same work team and equipment served both, so the phasing of the two sites had to be coordinated.

The excavations on Teatterikuja were supported, and settlement gauges were installed on the adjacent buildings. The readings were taken daily during excavation. Excavated soil was removed as soon as it was generated, as there was no room for stockpiling in the alley.

The work sequence was planned so that there was only one machine and one work phase in the alley at a time. Pipe materials were delivered in daily batches, not all at once.

The sites were phased in an interleaved way: when Teatterikuja was waiting for an inspection or materials, the work team moved to Pasila. This kept equipment downtime short.

In the more spacious surroundings of Kellosilta, the work progressed as normal excavation and installation work.

Photos

From the site

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project