Erottaja square

Location
Helsinki
Client
City of Helsinki
Schedule
2018-2019
Contract type
General contract
Contract value
approx. €3.3M
Services
Urban construction

We rebuilt Erottaja square and improved the adjoining streets. The square covers around 4,000 square metres in central Helsinki.

Around one hundred metres of water mains and two hundred metres of sewers were renewed in the square, and new cable conduits and a base course were built. The surface was paved with 4,000 square metres of granite slabs in Finnish stone types — three sizes and six colours in the same laying pattern.

We planted trees in a load-bearing growing medium and replaced the growing medium of three old lime trees using the vacuum excavation method. Four metal and granite works of art with plinths were installed in the square, as well as round benches with cast foundations around the old trees, fixed benches, bicycle racks and information boards.

On the adjoining streets — Erottajankatu, Bulevardi, Mannerheimintie and Eteläesplanadi — paving, traffic light, cable conduit and asphalting works were carried out.

01

The city centre doesn't close

The site was located in Helsinki's busiest pedestrian area, with tram and bus traffic passing through it. A significant part of the work was done at night, because during the day there was simply no room in the area.

02

The laying pattern leaves no room for error

Four thousand square metres of granite in three sizes and six colours is in practice one large pattern. A stone laid in the wrong place shows in the finished surface and cannot be fixed by moving a single slab.

03

The old lime trees had to be saved

The growing medium of three old lime trees was replaced with a load-bearing one using the vacuum excavation method. The roots could not be damaged, and the work was done on the trees' terms, according to their growing season.

The square was divided into sections, with one section under construction at a time. At every stage, pedestrians had a marked route through the square, and tram and bus traffic could pass.

Noisy and space-intensive work phases were carried out at night. Stone deliveries, lifts and asphalting were scheduled for times when the city centre was quiet.

The granite paving was laid stone by stone according to the plan, and each section was inspected before the next one was started. The stone batches were sorted by colour as soon as they were received.

The growing medium of the lime trees was replaced with a vacuum excavator without damaging the roots, and the work was timed for the right season for the trees. The round benches were cast around the trees only after the growing medium was completed.

The works of art were installed on their granite plinths last, once the surrounding surface was finished.

Photos

From the site

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project