Nauvontie – Korppaanmäentie construction

Location
Helsinki
Client
City of Helsinki
Schedule
2022-2023
Contract type
General contract
Contract value
approx. €6.7M
Services
Urban construction

In Ruskeasuo, we rehabilitated the street areas of Mannerheimintie, Nauvontie and Korppaanmäentie. The work included water supply and sewerage, the structural layers of the streets, technical systems and tram tracks.

A pile-founded noise barrier was also built on Nauvontie.

The site was located on one of Helsinki's busiest stretches of street. Trams, buses and cars use Mannerheimintie at the same time, and traffic could not be stopped.

01

The trams kept running the whole time

The tracks were renewed on a section served by several tram lines. The track replacement work had to fit into the operator's shutdowns, which lasted one weekend at a time.

02

All utilities in the same excavation

Water supply and sewerage, cables and street lighting ran in the same narrow excavation next to the tramway. Up-to-date information was not available on all the old utility lines.

03

A noise barrier in soft ground

The Nauvontie noise barrier was founded on piles right next to a carriageway in use. Piling causes vibration, and the vibration had to be kept within limits that the adjacent buildings and street structures could withstand.

The street section was divided into work phases, each with its own traffic arrangements. Traffic lanes were moved in phases so that traffic kept flowing the whole time, even as the lanes changed places.

The tram track replacements were scheduled for pre-agreed weekend shutdowns. The rails, supplies and equipment were on site on Friday, and traffic resumed on Monday morning.

The old utility lines were located with trial pits before the actual excavation. It cost a few days up front and saved weeks later on.

Vibration monitoring and measuring points on the adjacent structures were used during the piling of the noise barrier. The readings were reviewed with the client as the work progressed. There were no deviations.

Photos

From the site

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project