Improving fire safety at Rautatientori metro station

Location
Helsinki
Client
Pääkaupunkiseudun Kaupunkiliikenne Oy
Schedule
2024-2025
Contract type
General contract
Contract value
approx. €12M
Services
Renovation

We built new structures to improve fire safety at Rautatientori metro station. A smoke barrier structure consisting of a cast-in-place concrete beam and steel structures was built at platform level, and all building services at platform level were renewed.

New smoke doors were installed in the metro tunnels. Additional space was excavated in the rock tunnels for the doors, and the jamb structures were cast in concrete.

Rautatientori is Finland's busiest metro station. The main works were carried out during a traffic shutdown in summer 2024, and outside the shutdown the station remained in passenger use.

The goal was simple: after the work, the metro had to run — more safely.

01

The traffic shutdown doesn't bend

Rock excavation, concreting and door installation had to fit within the summer traffic shutdown. The shutdown dates had been fixed a year earlier and could not be negotiated. Everything scheduled for the shutdown had to be planned, and the materials had to be on site, before the first working day.

02

An underground site in the heart of the city

Materials, equipment and workers reached the station via the same routes as passengers. Concrete, steel structures and excavated rock were moved through restricted openings at night, beneath Helsinki's busiest stretch of street.

03

Four trades in the same space

Rock excavation, concrete structures, steel installation and building services all took place in the same spaces. One delayed work phase would have stopped the other three, because there was no room to make way.

The work phases scheduled for the shutdown were fully planned during the previous winter. Blasting patterns, reinforcement and formwork were dimensioned in advance, and materials were stored at the station before the shutdown began.

Production was managed daily. Each work phase was given its own time window and its own space, and the start of the next phase was tied to the completion of the previous one — not to a calendar date.

Excavated rock and demolition waste were removed at night, when the city centre's street network was clear. The same route served material deliveries in the opposite direction.

The concrete beam of the smoke barrier structure was cast in place, and the steel structures were installed on top of it immediately after the formwork was removed. The smoke doors were installed in the rock tunnels once the rock excavation and jamb structures were completed.

Metro traffic resumed on schedule after the shutdown.

Photos

From the site

Improving fire safety at Rautatientori metro station
Improving fire safety at Rautatientori metro station

Responsibility on site

Good work starts before the first work phase.

We plan the work, identify the risks and ensure quality as the work progresses. Inspections and documentation are part of the job from the start all the way to handover.

Safety — Everyone home safe.

Induction, risk assessment and safety observations are part of everyday life on site.

Quality — Inspected before it's covered.

Plans, inspections of work phases and documentation keep quality traceable.

Environment — Less waste on site.

We carefully plan the use of materials, transport and energy consumption.

Moisture management — Protection is part of the job.

Protecting materials and monitoring moisture are planned as part of construction.

Projects

These are the projects we have helped build.

Gräsantori street and bridge contract
Foundation engineering
Gräsantori street and bridge contract

A street, a square and two new bridges on soft clay, in the middle of traffic.

Olari, Espoo · 3/2026–7/2027 Explore the project
Pohjois-Haaga station renovation
Renovation
Pohjois-Haaga station renovation

Major renovation of a station platform and station building during a ten-week traffic shutdown, around the clock.

Pohjois-Haaga, Helsinki · 2026–2027 Explore the project
Lahela campus and Lahelanorsi
Foundation engineering
Lahela campus and Lahelanorsi

Streets, a bridge and municipal engineering for a new detailed plan area on soft, flood-prone ground.

Lahela, Tuusula · 3/2026– Explore the project
Gräsantulli – wastewater bypass pumping
Urban construction
Gräsantulli – wastewater bypass pumping

1,500 l/s bypass pumping and connections to a 1,800 mm sewer in operation, in three days.

Olari, Espoo · 2/2024–12/2024 Explore the project
Construction of the Joenranta residential area
Urban construction
Construction of the Joenranta residential area

Streets and municipal engineering for a new residential area with a lower carbon footprint – the carbon footprint was reduced by 29%.

Kellokoski, Tuusula · 12/2024–12/2025 Explore the project
Sinimäentie–Kalevalantie rehabilitation
Foundation engineering
Sinimäentie–Kalevalantie rehabilitation

Around 4.1 kilometres of water supply and sewer lines and street improvements on busy streets.

Mankkaa, Espoo · 5/2024–12/2025 Explore the project
Kruunuvuori oil tank restoration
Renovation
Kruunuvuori oil tank restoration

Restoration of an old oil tank and steel stairs to the top of a rock with no road access.

Kruunuvuorenranta, Helsinki · 2025 Explore the project
Maria campus – Lastenkodinkatu bridge
Urban construction
Maria campus – Lastenkodinkatu bridge

A post-tensioned concrete bridge and a natural stone wall in the middle of Baana traffic.

Kamppi, Helsinki · 11/2024–12/2025 Explore the project
Nurmilinnunpuisto park
Foundation engineering
Nurmilinnunpuisto park

Park paths, play areas and sports courts on challenging ground conditions.

Karakallio, Espoo · 9/2024–1/2025 Explore the project
Mannerheimintie between Postikatu and Reijolankatu
Urban construction
Mannerheimintie between Postikatu and Reijolankatu

Rehabilitation of the structures, utilities and tram tracks of Helsinki's main street in the middle of heavy traffic.

Mannerheimintie, Helsinki · 2023–2025 Explore the project